By combining the best features from Revit and 3ds Max it is possible to edit specific frames (images) within a movie. From Revit we get the required, linked building elements with their materials, and from 3ds Max we get the ability to render a sequence of PNG files. This workflow saves us the trouble of having to re-rendering the whole movie, say after removing reflecting materials, or making other edits.
In this video tutorial, Interoperability: Image Sequencing for Easy Editing, only the first 40 images of a 900 image sequence needed to be fixed. The first sequence had a reflective paver material that took 40 minutes to render in one frame. The second, “fixed,” sequence used a matte material that took about 20 minutes to render in one frame.
First Sequence with relective paver material |
Second, fixed, sequence with matte paver material |
For more information on the software solutions, training and consulting Ideate provides, please visit the Ideate Inc. website.
AEC Senior Application Specialist
Jim Cowan’s extensive AEC design industry experience, Autodesk design solutions expertise and status as an Autodesk Certified Instructor have made him a sought after University Curriculum developer, instructor and presenter. Jim’s areas of expertise include eLearning, interoperability between solutions and overcoming barriers to the adoption of Building Information Modeling (BIM). Educated in Architecture at Edinburgh College of Art/Heriot–Watt University and in Landscape Architecture at the University of Manitoba, Jim has a special focus on sustainability issues: daylight analysis, sun studies, lighting analysis, modeling buildings and conceptual energy modeling (models with shading devices). You can learn more from Jim on his YouTube Channel.